Tampa CEP Upgrades

The Tampa General Hospital CEP Upgrades was awarded to Borrell Electric Co., Inc. under a design/assist project delivery method, while self-performing General Contracting and Electrical Services. The contract value for the CEP Upgrades was approximately $13,000,000.00, and during the pre-construction phase, Borrell reduced the budget by 8% through innovative solutions. 

The project included a 15 kV double-end, dual fed, unit substation, a single-end essential substation, 8 new automatic transfer switches, and 5 new 480V motor control centers. Borrell also self-performed the installation and all medium voltage terminations for a 15 kV underground site distribution loop to feed the hospitals new essential substation. Borrell Electric Co., Inc. successfully completed the electrical service for the Tampa General Hospital Expansion in August 2008.

Project Location:
Tampa, FL

Project Status:
Completed

Architect:
Gresham Smith and Partners, Inc.

Engineer:
Smith Seckman Reid, Inc.

General Contractor:
Borrell Electric Co., Inc.

Project Gallery