USAA UPS & Generator Upgrades
USAA UPS & Generator Upgrades The USAA Commerce Park South Headquarters an 8-story, 500,000 square foot 6 story building building that is USAAs south headquarters. The building includes a 300,000 square fall call center, cafeteria, sports and amenities center, facilities shop, and parking garage. Borrell Electric has installed all electrical components of this building including […]
Nielson Media Research
Nielson Communications, Inc. Project Gallery
Intermedia
Intermedia Communications, Inc. Intermedia Communications, Inc. Headquarters and NOC Complex was a 941,000 square foot complex that included seven building. These buildings included the world operations center, a data center, three call centers, an office building, and a central energy plant. Borrell Electric provided the electrical service for the entire campus. This included a dual […]
Advent Health Tampa CEP
Advent Health Tampa CEP Project Gallery
SPP District Cooling Facility
Strategic Property Partners District Cooling Facility The District Cooling Facility was constructed to provide over 8,000 tons of chilled water to the Water Street District in downtown Tampa. This centralized facility will reduce overall operating costs and eliminate the need for unsightly cooling equipment on roofs of neighboring buildings. The project included (4) 3,000 AMP […]
Sarasota Memorial CEP
Sarasota Memorial Center Energy Plant The Sarasota Memorial Hospital Central Energy Plant (CEP) was constructed to update an aging mechanical and electrical infrastructure, as well as provide space for a new patient bed tower. This structure is located in the heart of a residential zone in downtown Sarasota. The hospital, design team, and contractors worked […]
Morton Plant Tower Expansion
Morton Plant Tower Expansion Project Gallery
Shands Cancer Center
Shands Cancer Center Project Location: Project Status: Owner: Architect: Engineer: General Contractor: Project Gallery
Sarasota Memorial
Sarasota Memorial Project Location: Project Status: Owner: Architect: Engineer: General Contractor: Project Gallery
Port of Tampa Gantry Cranes
Port of Tampa Gantry Cranes Installed power for two 600Amp 15 KV Gantry Cranes for the Port of Tampa. This involved refurbishing a 15KV 2000amp switchgear with new breakers and controls. Installed new conduit and 15KV cable from the switchgear to the Gantry Crane pit. New 600amp 15KV terminations in the switchgear and Gantry pit. […]